Jacksonville, Florida
Rez Solar is a solar installation service for Jacksonville-area homeowners on JEA or Beaches Energy. It would check which utility serves your address first, then give you a one-page rule sheet and two priced system sizes. Request a quote to see a system sized to what your exports earn.
Schematic, not to scale. Utility shown by town limits; the quote would confirm it by address.
Jacksonville, Florida
Rez Solar works Jacksonville and the Beaches, where the utility at your address sets the system size and decides what your surplus is worth. We check that first, then quote, because the same roof is a different job on JEA than on Beaches Energy.
What customers say
Serving Jacksonville and nearby towns
★★★★★5.0 from 10 Google reviews
What we do
Call or visit
| Office | 13475 Atlantic Blvd Unit 8 M773, Jacksonville, FL 32225Parking on site. |
|---|---|
| Estimates | Free, in writingDesign and price as separate documents. |
Why homeowners pick us
Our story
Installing across Jacksonville, Atlantic Beach, Neptune Beach and Orange Park.
Where we work
The utility sets what your exports earn, so it sets the size worth buying. Pick yours to open the export credit check with its rates filled in.
See what one system earns at your utility's rules. Pick the utility, the system size and how much of the output you expect to send to the grid. Change any rate to match your own bill. Everything runs on this device.
Yearly output uses EcoGen's Florida production factor of 1,555 kWh per kW DC. The export share is your assumption; ask for your own split in the quote.
JEA: fuel rate from October 1, 2026 (it resets monthly). Bought kWh: Tier 1 energy charge 7.815¢ plus the fuel charge, from October 1, 2026.
JEA address, 8 kW DC
Each exported kWh earns 36% of a bought kWh. Extra panels mostly add exports, so ask for the self-use size first.
Illustrative calculation, not a quote. Rates change; check them with your utility.
Before you compare solar quotes, find out what your utility pays for the power your panels send to the grid. That payment is the export credit: what you earn for each kilowatt-hour (kWh) your system makes but your home does not use at that moment. Around Jacksonville, two utilities pay very different export credits, and that difference decides how big your system should be.
JEA credits exports at its fuel rate, the part of the bill that covers JEA's fuel costs. You buy power at the normal rate and earn the fuel rate times the kWh you send to JEA. The fuel rate resets every month. From October 1, 2026, it was $43.26 per 1,000 kWh, about 4.326¢ per kWh, as Jacksonville Today reported from JEA's new rates. Ask JEA for the current fuel rate in writing before you sign.
Beaches Energy Services, the City of Jacksonville Beach's utility, credits exports at its usage charge plus its power cost adjustment (a monthly charge that passes through what it pays for wholesale power). On the Beaches Energy residential rates page, as posted on November 18, 2026, the November figures were 9.124¢ plus 3.892¢: 13.016¢ for each kWh a solar customer sells. That is about three times JEA's October credit.
The two utilities differ because Florida law lets them. The state's one-to-one net metering rule, Florida Public Service Commission (FPSC) Rule 25-6.065, binds only investor-owned utilities. Section 366.91(6) of the Florida Statutes has each municipal utility and co-op develop its own interconnection agreement and net metering program. JEA and Beaches Energy are both municipal, so each sets its own terms. If your bill names an investor-owned utility instead, the one-to-one rule applies.
The split runs through the beaches. JEA serves Atlantic Beach, so an Atlantic Beach address sits on the JEA side. Beaches Energy serves Neptune Beach and Jacksonville Beach, so a Neptune Beach home sits on the Beaches Energy side. Two identical roofs on either side of that town line can need different systems.
| JEA | Beaches Energy Services | |
|---|---|---|
| Who it serves | Most of Duval County and parts of Clay and St. Johns counties, including the City of Jacksonville and the Atlantic Beach and Orange Park town limits | Jacksonville Beach, Neptune Beach, Ponte Vedra Beach, Palm Valley |
| What an exported kWh earns | Fuel rate: 4.326¢ from October 1, 2026; resets monthly | Usage charge plus power cost adjustment: 13.016¢ in November, as posted November 18, 2026 |
| Extra credit | Accrues through the calendar year; remaining balance paid out under JEA's policy | Rolls forward up to 12 months; unused credit paid in the year's last billing cycle or when the account closes |
| How you apply | Application through PowerClerk, plus an Interconnection Agreement | Standard Interconnection Agreement plus a Tri-Party Net Metering Power Purchase Agreement with FMPA |
Ask any installer to show, on paper, how your utility's rules shaped the system they propose. Most quotes give you a size and a price. We give you four written deliverables that show the reasoning.
the four deliverables
kW DC is the panels' combined rated output. kW AC is what the inverter (the box that converts panel power into household current) can deliver. Utility tiers depend on size, so the sheet shows both.
The rule sheet is there to help you make four choices, in this order:
Keeping each one separate makes the price-per-watt check further down this page possible.
Before you accept a size, ask how much of its output gets exported and what those kWh earn. In the example below, only the utility changes.
Illustrative calculation. An 8 kW DC system in Jacksonville produces about 12,440 kWh a year, using EcoGen's Florida production factor of 1,555 kWh per kW. Assume 35% is exported (an assumption for this example, not data): 4,354 kWh go to the grid and 8,086 kWh are used at home.
- JEA address, exports at the 4.326¢ fuel rate (from October 1, 2026): about $188 a year.
- Beaches Energy address, exports at 13.016¢ (November, as posted November 18, 2026): about $567 a year.
Same panels, same roof, same 4,354 kWh. The utility moves the export value by about $380 a year.
Now compare that with what JEA charges for power you buy. From October 1, 2026, its energy charge is 7.815¢ per kWh for the first 1,000 kWh a month (Tier 1) and 9.705¢ above that (Tier 2). Add the 4.326¢ fuel charge and a bought kWh costs about 12.14¢ in Tier 1 and 14.03¢ in Tier 2.
So on JEA, each kWh you use at home instead of exporting is worth roughly 7.8¢ to 9.7¢ more. At the Tier 1 price, those 4,354 kWh would be worth about $529 used at home (Illustrative calculation), against $188 exported. That gap is why the self-use size usually makes more sense at a JEA address: extra panels mostly add exports, and exports earn the fuel rate.
Beaches Energy works differently. Solar customers are credited the same usage and power cost figures per kWh sold that the rates page lists for each kWh bought. In November, an exported kWh earned what a bought kWh cost in those two charges, so a bill-offset size gives up little value on exports, as long as you use the credit within the 12-month window. Two limits remain. The minimum monthly charge still applies, and the rates page does not say what rate pays out credit left over at year end, so ask Beaches Energy.
The JEA side also moves with the fuel rate:
| JEA fuel rate (Illustrative calculation) | Value of 4,354 exported kWh |
|---|---|
| 3.25¢ (a hypothetical lower month) | about $141 |
| 4.326¢ (from October 1, 2026) | about $188 |
| 5.863¢ (April 2026 peak, per Jacksonville Today) | about $255 |
Even at the April peak, JEA's export value stays under half the Beaches Energy figure. The rule sheet would print this for your address, using your own usage instead of the 35% assumption.
On a Beaches Energy address, the bigger size has one more check. The Beaches Energy net metering schedule puts systems up to 10 kW in Tier 1, with no application fee. Over 10 kW, Tier 2 carries a $320 fee and a higher proof-of-insurance figure. The state rule converts DC to AC at 0.85, which puts the 10 kW AC line at about 11.76 kW DC (Illustrative calculation). Ask Beaches Energy how it measures the 10 kW line, and ask the installer which tier each size lands in. A Size B that tips just over the line can add fees and insurance that a slightly smaller array would avoid.
Download twelve months of usage from your utility account before the visit. Hourly or daily data beats monthly totals, because it shows how much you use while the sun is up.
the assessment. About 90 minutes on site (an illustrative duration), plus desk work. It would check:
Bring your latest bill, the usage download, a photo of the main panel label, the roof's age, your HOA rules and your property survey. Note planned changes such as an electric vehicle, as the DOE's step-by-step guide advises, because a new load changes both sizes.
An Orange Park address inside town limits is a JEA address, but many "Orange Park" mailing addresses lie in unincorporated Clay County. For those, and for St. Johns County addresses, the assessment would confirm the utility by address before any sizing.
To compare two quotes fairly, convert each to price per watt. Strip out any battery, roof work or main panel upgrade first. Then divide the remaining cash price by the system's DC watts.
Within the solar line, the price moves with system size, panel and inverter choice, roof type, attachment work and wiring runs. Coastal addresses can add paperwork: the Atlantic Beach and Jacksonville Beach permit checklists ask for the equipment elevation in FEMA flood zones, and Jacksonville Beach asks for the manufacturer's wind-loading specs.
Then compare. EcoGen's Florida solar cost benchmark of $2.46 per watt (State benchmark: EcoGen Solar Cost Index, September 2026 Edition, prices as of September 25, 2026) is a cash price for solar only. Its typical Florida system is 11.09 kW at $27,281, and EcoGen puts most Florida quotes between $2.10 and $2.70 per watt (pricing data as of February 2026). It is a modeled installed price before incentives, not a quote for your roof.
Illustrative calculation. A solar-only cash quote of $24,300 for a 9.0 kW DC system works out to $24,300 ÷ 9,000 W = $2.70 per watt. At the $2.46 State benchmark, 9 kW would cost $22,140. The quote sits about $2,160 higher, at the top of EcoGen's range.
Take that gap to the installer as a question. A good answer names a line item: a complex roof, a premium inverter, extra engineering.
The check also shows why size matters on JEA. Every added watt costs the full installed price, while much of the extra output it makes is exported at the fuel rate.
Incentives have changed. The IRS says the federal Residential Clean Energy Credit is not available for property placed in service after December 31, 2025, so a homeowner-owned system placed in service in 2026 gets no federal credit. Florida still exempts solar energy systems from sales tax, and the value a renewable energy device adds to a home may not be counted in its property tax assessment.
Ask the installer who files each approval and in what order. Inside the consolidated City of Jacksonville, the City's Building Inspection Division issues the permit under the Florida Building Code, 8th Edition:
In a local historic district or on a designated landmark, exterior work needs a Certificate of Appropriateness (the City's approval that a change fits the district), applied for through the LUZAP portal. The City's historic preservation FAQ says administrative approvals take "a week or two" and Commission review at least a month. Ask which route rooftop solar takes for your property.
If you have an HOA, Section 163.04 of the Florida Statutes says it cannot prohibit solar collectors. It may choose where they go, within south or 45 degrees east or west of due south, if that does not impair performance.
The beach cities run their own building departments, and each wants a utility document first. Atlantic Beach asks for a JEA Letter of Approval. Neptune Beach's solar form says a permit is required from Beaches Energy. Jacksonville Beach wants executed Beaches Energy agreements before it reviews anything.
Who files the utility paperwork, and when can you switch on? The answer differs by utility.
On JEA, the application goes through PowerClerk (JEA's online interconnection portal), and an Interconnection Agreement is required. If you use JEA MyWay, note that solar customers cannot stay on it. Three points need JEA's answer in writing: when it changes the meter, when it gives permission to operate, and whether it nets exports over the billing month or a shorter interval. The rule sheet would list all three as open until JEA confirms them. The last one matters because the shorter the interval, the more of your output counts as exported.
On Beaches Energy, the net metering rate schedule requires a Standard Interconnection Agreement and a Tri-Party agreement with FMPA, the Florida Municipal Power Agency. The schedule also sets proof of insurance by tier (listed at $100,000 for Tier 1) and caps participation at 2.5% of aggregate customer peak demand, first come, first served. Confirm both with Beaches Energy, and ask whether the cap is close. The local code official inspects before the system runs in parallel with the grid.
the paperwork sequence
| Step | Who files | What comes back |
|---|---|---|
| Utility application | Installer, with your signature | JEA: Interconnection Agreement. Beaches Energy: executed standard and tri-party agreements |
| Building permit | Installer | Permit (City: through JaxEPICS) |
| Notice of Commencement (over $5,000) | Owner signs; recorded before first inspection | Recorded notice, posted on site |
| Installation and inspections | Installer books inspections | Passed final inspection |
| Meter change and switch-on | Utility, after approvals | Permission to operate (confirm timing with your utility) |
The DOE says installation generally takes a few days, while permits and inspections can take weeks to months. Most of that waiting sits in the utility and permit rows.
Settle these in the contract, before switch-on.
Then check your first statements against the rule sheet: on JEA, credits at the fuel rate accruing through the calendar year; on Beaches Energy, credits rolling forward, with any unused balance paid in the year's last billing cycle. Raise any mismatch while the numbers are fresh.
Use this list with any Jacksonville-area quote; the quote checklist on this site carries the same points.
It depends on your utility more than your roof. With no federal credit for systems placed in service after 2025, the value comes from your bill. On JEA, home-used kWh displace power costing about 12¢ to 14¢ (from October 1, 2026) while exports earn the fuel rate, so a self-use size usually makes more sense. On Beaches Energy, exports earned 13.016¢ in November, so more of the production keeps its value.
Check on paper first. A battery shifts solar power from export to evening use, so each kWh shifted on JEA could be worth the gap between the fuel rate and the bought price, roughly 7.8¢ to 9.7¢ from October 1, 2026. Whether that covers the battery's price is the open question, which is why we quote it separately.
Rez Solar's coverage of Jacksonville, Atlantic Beach, Neptune Beach, Jacksonville Beach and Orange Park covers these towns.
Atlantic Beach and Neptune Beach share a town line and two different utilities. Each guide covers the permit office and the utility rule that change the quote there.
Exports earn the monthly fuel rate.
Exports earn the usage charge plus power cost adjustment.
Choose your town and the utility on your bill. The site builds the checklist to bring to any installer's quote visit, with your utility's rules in it. It runs on this device: nothing is sent or stored.