Rez Solar

Private website concept. Rez Solar appears here as a proposed solar service, not an operating company. Nothing on this site is sent anywhere.

Jacksonville, Florida

Solar installer in Jacksonville, FL | Rez Solar

Rez Solar is a solar installation service for Jacksonville-area homeowners on JEA or Beaches Energy. It would check which utility serves your address first, then give you a one-page rule sheet and two priced system sizes. Request a quote to see a system sized to what your exports earn.

  • For Jacksonville homeowners on JEA or Beaches Energy
  • A dated utility rule sheet and two sizes
  • See what your exports earn before signing

Get your free quote Check your export credit

Which utility is on your bill?

Schematic of Jacksonville, Orange Park and the beach towns, coloured by electric utility Atlantic Ocean St. Johns River Intracoastal Waterway JacksonvilleAtlantic BeachNeptune BeachJacksonville BeachOrange Park

Schematic, not to scale. Utility shown by town limits; the quote would confirm it by address.

  • JEA4.326¢ per exported kWhJEA's fuel rate, from October 1, 2026. It resets every month.
  • Beaches Energy13.016¢ per exported kWhUsage charge plus power cost adjustment, November 2026, as posted November 18, 2026.
  • 5.0 from 10 reviews
  • Jacksonville, FL

Jacksonville, Florida

Solar quoted around your utility's rules

Rez Solar works Jacksonville and the Beaches, where the utility at your address sets the system size and decides what your surplus is worth. We check that first, then quote, because the same roof is a different job on JEA than on Beaches Energy.

What customers say

Rez SolarSolar design and installation · Jacksonville, FL

Serving Jacksonville and nearby towns

★★★★★5.0 from 10 Google reviews

What we do

What we do

  1. Utility rule checkA one-page sheet on your utility's size cap, credit and application.
  2. Rooftop solarPanels and layout priced per DC watt against that cap.
  3. Hurricane-rated mountingRacking specified for the wind zone and the roof covering.
  4. Battery for outagesStorage sized for the circuits you want to keep running.

Call or visit

Talk to us

Office13475 Atlantic Blvd Unit 8 M773, Jacksonville, FL 32225Parking on site.
EstimatesFree, in writingDesign and price as separate documents.

Get your free quote

Why homeowners pick us

Why homeowners pick us

  • Rules before panelsThe utility sets the design envelope. We start with it.
  • Two optionsA smaller system and a larger one, both priced, so you choose.
  • Free written estimateA design and a price before you commit to anything.

Our story

Our story

  1. Installing across Jacksonville, Atlantic Beach, Neptune Beach and Orange Park.

Downtown Jacksonville's towers and the blue Main Street Bridge across the St. Johns River on a sunny day with tall white clouds.

Export credit check

See what one system earns at your utility's rules. Pick the utility, the system size and how much of the output you expect to send to the grid. Change any rate to match your own bill. Everything runs on this device.

Yearly output uses EcoGen's Florida production factor of 1,555 kWh per kW DC. The export share is your assumption; ask for your own split in the quote.

Rows of blue solar panels on a grey shingle roof under a blue sky with white clouds. A stock photo, not a Rez Solar installation.
Utility on the bill

JEA: fuel rate from October 1, 2026 (it resets monthly). Bought kWh: Tier 1 energy charge 7.815¢ plus the fuel charge, from October 1, 2026.

JEA address, 8 kW DC

Yearly output
12,440 kWh
Used at home
8,086 kWh
Exported
4,354 kWh
Exports earn
$188 a year
Same kWh used at home
$529 a year

Each exported kWh earns 36% of a bought kWh. Extra panels mostly add exports, so ask for the self-use size first.

Illustrative calculation, not a quote. Rates change; check them with your utility.

Your utility, not your roof, sets the right size

Before you compare solar quotes, find out what your utility pays for the power your panels send to the grid. That payment is the export credit: what you earn for each kilowatt-hour (kWh) your system makes but your home does not use at that moment. Around Jacksonville, two utilities pay very different export credits, and that difference decides how big your system should be.

JEA credits exports at its fuel rate, the part of the bill that covers JEA's fuel costs. You buy power at the normal rate and earn the fuel rate times the kWh you send to JEA. The fuel rate resets every month. From October 1, 2026, it was $43.26 per 1,000 kWh, about 4.326¢ per kWh, as Jacksonville Today reported from JEA's new rates. Ask JEA for the current fuel rate in writing before you sign.

Beaches Energy Services, the City of Jacksonville Beach's utility, credits exports at its usage charge plus its power cost adjustment (a monthly charge that passes through what it pays for wholesale power). On the Beaches Energy residential rates page, as posted on November 18, 2026, the November figures were 9.124¢ plus 3.892¢: 13.016¢ for each kWh a solar customer sells. That is about three times JEA's October credit.

The two utilities differ because Florida law lets them. The state's one-to-one net metering rule, Florida Public Service Commission (FPSC) Rule 25-6.065, binds only investor-owned utilities. Section 366.91(6) of the Florida Statutes has each municipal utility and co-op develop its own interconnection agreement and net metering program. JEA and Beaches Energy are both municipal, so each sets its own terms. If your bill names an investor-owned utility instead, the one-to-one rule applies.

The split runs through the beaches. JEA serves Atlantic Beach, so an Atlantic Beach address sits on the JEA side. Beaches Energy serves Neptune Beach and Jacksonville Beach, so a Neptune Beach home sits on the Beaches Energy side. Two identical roofs on either side of that town line can need different systems.

JEA Beaches Energy Services
Who it serves Most of Duval County and parts of Clay and St. Johns counties, including the City of Jacksonville and the Atlantic Beach and Orange Park town limits Jacksonville Beach, Neptune Beach, Ponte Vedra Beach, Palm Valley
What an exported kWh earns Fuel rate: 4.326¢ from October 1, 2026; resets monthly Usage charge plus power cost adjustment: 13.016¢ in November, as posted November 18, 2026
Extra credit Accrues through the calendar year; remaining balance paid out under JEA's policy Rolls forward up to 12 months; unused credit paid in the year's last billing cycle or when the account closes
How you apply Application through PowerClerk, plus an Interconnection Agreement Standard Interconnection Agreement plus a Tri-Party Net Metering Power Purchase Agreement with FMPA

What the quote puts in writing

Ask any installer to show, on paper, how your utility's rules shaped the system they propose. Most quotes give you a size and a price. We give you four written deliverables that show the reasoning.

the four deliverables

  1. A one-page utility rule sheet. Your utility and rate schedule, dated. What you pay per kWh, including tiers and fuel or power cost charges, and what an exported kWh earns. The carry-over and payout rule, the interconnection tier with its fees and insurance, and which utility document the building department needs before it issues a permit.
  2. Two sizes, side by side. Size A is the self-use size: most of the power is used in the house as it is made. Size B is the bill-offset size: it covers more of your yearly usage, which means more exports. For each: kW DC and kW AC, yearly kWh, kWh self-used versus exported, and what each stream is worth at your utility's rates. Then the price, the price per watt and a comparison with the state benchmark.
  3. An export-credit sensitivity. What the export value becomes if the credit moves. On JEA, it moves every month.
  4. A paperwork sequence. Who files the utility application, which approval comes back, who files the permit, which inspections follow, and when the meter changes.

kW DC is the panels' combined rated output. kW AC is what the inverter (the box that converts panel power into household current) can deliver. Utility tiers depend on size, so the sheet shows both.

The choices you would make

The rule sheet is there to help you make four choices, in this order:

  • Size A or Size B. Pick after you see each size's exported kWh priced at your utility's credit.
  • Battery or no battery. Under the service, we'd quote a battery only where the rule sheet shows an exported kWh is worth much less than a bought one, and price it as its own line.
  • Main panel upgrade. Only if the assessment finds the electrical panel has no room. Also its own line.
  • Roof work first. Only if the roof's age or condition would force the panels off again soon. Also its own line.

Keeping each one separate makes the price-per-watt check further down this page possible.

Worked example: one roof, two utilities

Before you accept a size, ask how much of its output gets exported and what those kWh earn. In the example below, only the utility changes.

Illustrative calculation. An 8 kW DC system in Jacksonville produces about 12,440 kWh a year, using EcoGen's Florida production factor of 1,555 kWh per kW. Assume 35% is exported (an assumption for this example, not data): 4,354 kWh go to the grid and 8,086 kWh are used at home.

  • JEA address, exports at the 4.326¢ fuel rate (from October 1, 2026): about $188 a year.
  • Beaches Energy address, exports at 13.016¢ (November, as posted November 18, 2026): about $567 a year.

Same panels, same roof, same 4,354 kWh. The utility moves the export value by about $380 a year.

Now compare that with what JEA charges for power you buy. From October 1, 2026, its energy charge is 7.815¢ per kWh for the first 1,000 kWh a month (Tier 1) and 9.705¢ above that (Tier 2). Add the 4.326¢ fuel charge and a bought kWh costs about 12.14¢ in Tier 1 and 14.03¢ in Tier 2.

So on JEA, each kWh you use at home instead of exporting is worth roughly 7.8¢ to 9.7¢ more. At the Tier 1 price, those 4,354 kWh would be worth about $529 used at home (Illustrative calculation), against $188 exported. That gap is why the self-use size usually makes more sense at a JEA address: extra panels mostly add exports, and exports earn the fuel rate.

Beaches Energy works differently. Solar customers are credited the same usage and power cost figures per kWh sold that the rates page lists for each kWh bought. In November, an exported kWh earned what a bought kWh cost in those two charges, so a bill-offset size gives up little value on exports, as long as you use the credit within the 12-month window. Two limits remain. The minimum monthly charge still applies, and the rates page does not say what rate pays out credit left over at year end, so ask Beaches Energy.

The JEA side also moves with the fuel rate:

JEA fuel rate (Illustrative calculation) Value of 4,354 exported kWh
3.25¢ (a hypothetical lower month) about $141
4.326¢ (from October 1, 2026) about $188
5.863¢ (April 2026 peak, per Jacksonville Today) about $255

Even at the April peak, JEA's export value stays under half the Beaches Energy figure. The rule sheet would print this for your address, using your own usage instead of the 35% assumption.

Where Size B can cross a fee line on Beaches Energy

On a Beaches Energy address, the bigger size has one more check. The Beaches Energy net metering schedule puts systems up to 10 kW in Tier 1, with no application fee. Over 10 kW, Tier 2 carries a $320 fee and a higher proof-of-insurance figure. The state rule converts DC to AC at 0.85, which puts the 10 kW AC line at about 11.76 kW DC (Illustrative calculation). Ask Beaches Energy how it measures the 10 kW line, and ask the installer which tier each size lands in. A Size B that tips just over the line can add fees and insurance that a slightly smaller array would avoid.

The assessment: what is checked and what to bring

Download twelve months of usage from your utility account before the visit. Hourly or daily data beats monthly totals, because it shows how much you use while the sun is up.

the assessment. About 90 minutes on site (an illustrative duration), plus desk work. It would check:

  • Utility and rate. Utility, rate schedule, usage tiers, account and meter type.
  • Daytime versus night use. Your twelve months split into what solar can cover directly and what you draw after dark. That split is the starting point for Size A.
  • Roof. Age, covering, slope, the direction each face points, and shade by face. The U.S. Department of Energy says panels perform best on south-facing roofs sloped 15 to 40 degrees, and says to consider the roof's age.
  • Electrical. The main panel's rating and spare spaces, and where the AC rating lands against the utility's tier lines.
  • Wind, flood and coast. Wind-load and attachment needs go to the engineer. The assessor notes whether the address sits in a FEMA flood hazard area and whether oceanfront coastal construction rules could apply.
  • Property rules. HOA covenants, historic district or local landmark status.
  • Permit route. Which building department has jurisdiction and which utility document it wants first.

Bring your latest bill, the usage download, a photo of the main panel label, the roof's age, your HOA rules and your property survey. Note planned changes such as an electric vehicle, as the DOE's step-by-step guide advises, because a new load changes both sizes.

An Orange Park address inside town limits is a JEA address, but many "Orange Park" mailing addresses lie in unincorporated Clay County. For those, and for St. Johns County addresses, the assessment would confirm the utility by address before any sizing.

Check the price per watt against the Florida benchmark

To compare two quotes fairly, convert each to price per watt. Strip out any battery, roof work or main panel upgrade first. Then divide the remaining cash price by the system's DC watts.

Within the solar line, the price moves with system size, panel and inverter choice, roof type, attachment work and wiring runs. Coastal addresses can add paperwork: the Atlantic Beach and Jacksonville Beach permit checklists ask for the equipment elevation in FEMA flood zones, and Jacksonville Beach asks for the manufacturer's wind-loading specs.

Then compare. EcoGen's Florida solar cost benchmark of $2.46 per watt (State benchmark: EcoGen Solar Cost Index, September 2026 Edition, prices as of September 25, 2026) is a cash price for solar only. Its typical Florida system is 11.09 kW at $27,281, and EcoGen puts most Florida quotes between $2.10 and $2.70 per watt (pricing data as of February 2026). It is a modeled installed price before incentives, not a quote for your roof.

Illustrative calculation. A solar-only cash quote of $24,300 for a 9.0 kW DC system works out to $24,300 ÷ 9,000 W = $2.70 per watt. At the $2.46 State benchmark, 9 kW would cost $22,140. The quote sits about $2,160 higher, at the top of EcoGen's range.

Take that gap to the installer as a question. A good answer names a line item: a complex roof, a premium inverter, extra engineering.

The check also shows why size matters on JEA. Every added watt costs the full installed price, while much of the extra output it makes is exported at the fuel rate.

Incentives have changed. The IRS says the federal Residential Clean Energy Credit is not available for property placed in service after December 31, 2025, so a homeowner-owned system placed in service in 2026 gets no federal credit. Florida still exempts solar energy systems from sales tax, and the value a renewable energy device adds to a home may not be counted in its property tax assessment.

Permits in Jacksonville, step by step

Ask the installer who files each approval and in what order. Inside the consolidated City of Jacksonville, the City's Building Inspection Division issues the permit under the Florida Building Code, 8th Edition:

  1. Submit online through JaxEPICS. The City requires electronic submission for all permit types, through a JaxEPICS account.
  2. Clear zoning and concurrency. Plan review starts only after Zoning, Concurrency and Development Services approve the plans for review and the fee is paid.
  3. Expect a wait. The City says to expect 25 to 30 business days for a building permit's first review and about 10 or fewer for resubmissions. That is a general figure, not a solar-specific one.
  4. Record a Notice of Commencement. For improvements over $5,000, this public notice that work is starting must be recorded before the first inspection. The owner signs it, and it is posted on site with the permit.
  5. Book inspections. Request them by phone or online for the next business day, with the approved plans on site in a weatherproof container.
  6. Mind the clock. A permit is good for 180 days.

In a local historic district or on a designated landmark, exterior work needs a Certificate of Appropriateness (the City's approval that a change fits the district), applied for through the LUZAP portal. The City's historic preservation FAQ says administrative approvals take "a week or two" and Commission review at least a month. Ask which route rooftop solar takes for your property.

If you have an HOA, Section 163.04 of the Florida Statutes says it cannot prohibit solar collectors. It may choose where they go, within south or 45 degrees east or west of due south, if that does not impair performance.

The beach cities run their own building departments, and each wants a utility document first. Atlantic Beach asks for a JEA Letter of Approval. Neptune Beach's solar form says a permit is required from Beaches Energy. Jacksonville Beach wants executed Beaches Energy agreements before it reviews anything.

Utility handoff and installation sequence

Who files the utility paperwork, and when can you switch on? The answer differs by utility.

On JEA, the application goes through PowerClerk (JEA's online interconnection portal), and an Interconnection Agreement is required. If you use JEA MyWay, note that solar customers cannot stay on it. Three points need JEA's answer in writing: when it changes the meter, when it gives permission to operate, and whether it nets exports over the billing month or a shorter interval. The rule sheet would list all three as open until JEA confirms them. The last one matters because the shorter the interval, the more of your output counts as exported.

On Beaches Energy, the net metering rate schedule requires a Standard Interconnection Agreement and a Tri-Party agreement with FMPA, the Florida Municipal Power Agency. The schedule also sets proof of insurance by tier (listed at $100,000 for Tier 1) and caps participation at 2.5% of aggregate customer peak demand, first come, first served. Confirm both with Beaches Energy, and ask whether the cap is close. The local code official inspects before the system runs in parallel with the grid.

the paperwork sequence

Step Who files What comes back
Utility application Installer, with your signature JEA: Interconnection Agreement. Beaches Energy: executed standard and tri-party agreements
Building permit Installer Permit (City: through JaxEPICS)
Notice of Commencement (over $5,000) Owner signs; recorded before first inspection Recorded notice, posted on site
Installation and inspections Installer books inspections Passed final inspection
Meter change and switch-on Utility, after approvals Permission to operate (confirm timing with your utility)

The DOE says installation generally takes a few days, while permits and inspections can take weeks to months. Most of that waiting sits in the utility and permit rows.

Aftercare and monitoring questions

Settle these in the contract, before switch-on.

  • Monitoring. Who owns the monitoring app and data? Who gets the alert when production drops, and what happens next?
  • Warranties. How long does the workmanship warranty run, and does it cover leaks at roof penetrations? If you finance, the U.S. Treasury's buyer advisory says to check whether warranties last as long as the loan.
  • Insurance. Ask your insurer whether the system is covered and whether your premium changes.

Then check your first statements against the rule sheet: on JEA, credits at the fuel rate accruing through the calendar year; on Beaches Energy, credits rolling forward, with any unused balance paid in the year's last billing cycle. Raise any mismatch while the numbers are fresh.

Questions to ask any Jacksonville solar installer before you sign

Use this list with any Jacksonville-area quote; the quote checklist on this site carries the same points.

  1. Which utility serves this address, on which dated rate? The quote should name JEA or Beaches Energy, the rate schedule and the export credit with its date.
  2. How many kWh would I use and export, per size? Ask for the split for a self-use size and a bill-offset size, with each stream's dollar value.
  3. What is the solar-only price per watt? Remove battery, roof and panel-upgrade lines, divide by DC watts and compare with the $2.46 State benchmark.
  4. Am I buying more panels than I need? The Treasury's Before You Buy Solar Panels guide suggests asking exactly that, plus the cost per watt and how average monthly kWh compare with your usage.
  5. Which tier does each size fall in, and what fees and insurance come with it?
  6. Which utility document comes before the permit, and who files it?
  7. Who signs the Notice of Commencement, and when is it recorded?
  8. Will the lender file a UCC-1 lien? That public filing secures the loan against the equipment. Ask how it is handled if you sell or refinance.
  9. Do I have a three-day right to cancel? The Treasury advisory says to get every promise in writing and be careful about signing on a seller's tablet.
  10. Which Florida license covers this work? Under Section 489.105 of the Florida Statutes, a solar contractor's scope covers photovoltaic systems, and other certified contractors may do the work only within their own scope. Look the license up on the state's DBPR search yourself.
  11. Does the equipment meet Florida Solar Energy Center (FSEC) standards? State law requires solar systems sold in Florida to meet them, and the Atlantic Beach and Jacksonville Beach permit checklists ask for that information.

Short answers

Is solar worth it in Florida in 2026?

It depends on your utility more than your roof. With no federal credit for systems placed in service after 2025, the value comes from your bill. On JEA, home-used kWh displace power costing about 12¢ to 14¢ (from October 1, 2026) while exports earn the fuel rate, so a self-use size usually makes more sense. On Beaches Energy, exports earned 13.016¢ in November, so more of the production keeps its value.

Does a battery make sense on JEA?

Check on paper first. A battery shifts solar power from export to evening use, so each kWh shifted on JEA could be worth the gap between the fuel rate and the bought price, roughly 7.8¢ to 9.7¢ from October 1, 2026. Whether that covers the battery's price is the open question, which is why we quote it separately.

Does Rez Solar serve my area?

Rez Solar's coverage of Jacksonville, Atlantic Beach, Neptune Beach, Jacksonville Beach and Orange Park covers these towns.

On this page 10 sections

Four town guides, split by utility

Atlantic Beach and Neptune Beach share a town line and two different utilities. Each guide covers the permit office and the utility rule that change the quote there.

Beaches Energy addresses

Exports earn the usage charge plus power cost adjustment.

Get your free quote

Choose your town and the utility on your bill. The site builds the checklist to bring to any installer's quote visit, with your utility's rules in it. It runs on this device: nothing is sent or stored.